Forensic schedule analysis for P6, MS Project and Powerproject

Know where your project
really stands.

Find the hidden slippage and non-compliance in your contractor's programme before you accept it. Every update checked against the last, every finding cited to its standard. Your first check is free.

How it works

Three simple steps to a professional schedule report.

1. Upload

Drag and drop your Primavera P6 (.xer / .xml), MS Project (.xml / .mpp), or Asta Powerproject (.pp) file. We handle the parsing.

2. Analyse

Our engine checks logic, float, constraints, calendars, and critical path automatically.

3. Report

Download a polished PDF with AI-generated executive narrative and detailed findings.

Everything you need

Forensic-grade analysis on your schedule — quality, delay, and the integrity checks that catch a gamed update.

Any P6, MS Project or Asta file

Primavera P6 (XER + XML), MS Project (XML + MPP), and Asta Powerproject (PP) — all parsed natively, no conversion step. Every upload also opens free in the Programme tab, a viewer in your browser.

Schedule health & quality

An A–F Schedule Quality Grade over the DCMA 14-Point checks, critical-path trace, float distribution, and an Earned Schedule completion forecast with the required pace, where a baseline is available.

Delay & EOT analysis

Two-schedule forensic comparison and multi-update series tracking, with one delay figure, categorised drivers beneath it, and a supported-EOT position from your own event tagging.

Catch a gamed update

Mode switches, concealed slip, rewritten actuals, and critical-path churn — the manipulation checks no other schedule tool puts front and centre. Evidence, never intent.

Track one programme over time

A subscriber dashboard trends quality, the programme's finish, and integrity signals across every update — with an honest re-baseline timeline and two agents you can ask.

Deterministic first, private always

Every number is computed by a Python engine — AI only writes the findings up. Your file is deleted after analysis; what we keep is encrypted and only yours; nothing is used for model training.

Simple, transparent pricing

Pay per report or save with a monthly plan.

Schedule Health

$29/analysis

Single-file quality, logic, float, and constraints report.

Health report pricing

Schedule Comparison

$79/analysis

Compare 2+ versions — forensic before-and-after, or a multi-update trend for 3 or more.

Comparison pricing

Monthly Plans

From $79/mo

Track a programme over time with the Project dashboard, from 1 analysis a month on Single Project to unlimited on Professional.

Compare monthly plans

Ready to analyse your schedule?

Turn a schedule file into a defensible forensic report — quality, delay, and integrity — in minutes. Planners, PMs, and delay analysts on construction and infrastructure programmes.