New analysis
Not sure which analysis to run, or how the monthly workflow fits together? See the subscriber guide.
Not sure which one to pick? Compare the two
Health Check
1 file · $29
Pick this when
- A contractor submits a new baseline and you need to decide whether to accept it.
- Monthly programme review where you want a DCMA 14-Point quality scorecard.
- One-off integrity check on a programme handed to you for verification.
Schedule Comparison
2 or more files · $79
Pick this when
- Assessing or preparing an extension-of-time claim that hangs on a specific delay event.
- A defensible before-and-after of a re-statused or re-baselined programme (two files).
- Tracking three or more updates to see how float, quality and completion have moved over time.
Drag and drop your files here, or browse
Supports .xer, .xml, .pp and .mpp (Primavera P6, MS Project, Asta Powerproject)
Advanced options — key milestone keywords
The report already auto-detects common completion and handover milestones from the activity names plus any finish milestone on the critical path. Use these fields only if the default set is missing a milestone that matters on your contract, or picking up activities you want excluded.
Case-insensitive substring match against activity names. Matches are included on top of the defaults.
Defects / warranty / DLP activities are already excluded by default — you only need to add extras if the auto-detection is picking up something you do not want.